02 9673 8000 qld.
Dindas floor joists.
More options for more economical floor joist layouts.
I think we were supplying three or four houses a day at one point.
í ï smartlvl hanger details í ì î.
Floor joists for houses supporting floor loads only cantilever 40kg m 2 overall depth mm nominal clear distance between flanges flange width mm single span continuous span balcony 3 45 63 90 joist spacing mm flange outstand mm 1 450 600 450 600 450 600 18 27 39 recommended maximum span maximum m 200 130 mm hj200 45 13 8 kg 118 mm 3.
It was a lot of timber.
03 8540 0500 nsw.
Dindas joists are strong light weight easy to install and available in a wide range of sizes.
Pitching beams 23 common installation details 25 notches cuts and holes in beams bearers joists and rafters 26.
Dindas says i think we ended up supplying something like 960 residences with floor systems and the olympic games village supply continued for something like four years.
07 3249 9888 for product advice and the latest updates subscribe to the dindas bulletin.
Our joists give you more options for designing economical floor joist layouts.
Span tables index of span tables í í scope of this publication this design guide and load tables assist in the selection of smartlvl í ð í ñ beams for most of the common structural ar rangements met in domestic construction.
Access more span tables.
Sj smartjoist tillings lgl hyne lvl e13 e14 e15 dindas wesbeam lvl e15 tillings smartframe lvl formwork scaffolding.
I also always use the best available waterproofing methods and.
Engineered i joists dindas australia.
Consisting of structural lvl flanges and a structural plywood web connected using a type a waterproof bond dindas joists are strong light and easy to install.
ô deck bearers and joists õ í.
Select the economy section 240 45 300 45 360 45 of appropriate depth to accommodate the spans of the main area.
Floor joists often had large crowns and the 5 8 inch commodity osb decking.
Hyne timber design 7 5 includes the engineering properties and span tables for hyne timber wesbeam tilling carter holt harvey and louisiana pacific products.
For most external walls the simplest answer is to just continue the upper storey bracing and associated tie down through the floor to the top plate of the lower storey wall.